top of page
Wind Power: Vermont Leads
Wind Power: Vermont Leads

Sat, Jun 13

|

Big Picture Theater & Cafe

Wind Power: Vermont Leads

Join Vermont Productions at The Big Picture as they return for another documentary debut. Screening Saturday, June 13th @ 7pm Please RSVP to this free event. Donations accepted at the door.

Time & Location

Jun 13, 2026, 7:00 PM

Big Picture Theater & Cafe, 48 Carroll Rd, Waitsfield, VT 05673, USA

About the event

Wind Power

Vermont Leads the Way

It is relatively unknown that in 1941 in Vermont, the first megawatt-size wind turbine on Grandpa’s Knob, was connected to the local electrical grid. The 1.25-MW Smith-Putnam wind turbine is erected in Castletown, Vermont.  Incredibly, it took over 40 years before this feat was once again accomplished. The documentary focuses on how this came about, those involved, how the turbine was developed and built, and its impact on the future of power producing wind turbines.

Share this event

unnamed_edited.jpg

802 - 496 - 8994
48 Carroll Road, Waitsfield, Vermont 05673
Mail: PO Box 415, Waitsfield VT 05673

  • Instagram
  • Facebook
Big Picture Email Sign-Up

Be the first to know about events, specials, and family fun!

bottom of page